A Concession Note on the First Piece

Someone wrote a concession. The dimension is still out of the band. You hold the first machined aluminum bracket in your left hand, calipers still open to the measured 0.004 inch over the print spec across the mounting flange. You set the part on the non-slip bench mat next to the half-empty thread cutting fluid bottle, eyes flicking between the scribbled red note in the margin of the print and this sheet in your right hand. The CNC mill runs idle behind you, its spindle still warm from the first 12-minute run cycle that produced this test part, no error codes flashing on its control screen to indicate a misalignment or programming error.

Details captured on this concession note

You cross-reference each line on the sheet against the print to make sure no relevant detail is missing. The top of the sheet lists the full part number, the job run number, and the machine ID assigned to this order, so anyone pulling the document later can tie it directly to this exact production batch. The second block spells out the specific dimension that falls outside the print tolerance, the measured value submitted by the process engineer who drafted the concession, and a short note explaining that the oversized flange does not interfere with final assembly, since the mating housing has a 0.010 inch clearance slot that accommodates the extra width with no impact on structural performance or alignment. Illustrative example: the allowed tolerance band for the mounting flange width is 2.125 to 2.128 inches, and your measured first piece reads 2.132 inches, which falls 0.004 inches outside the upper limit, matching the value noted on the concession. The signature block at the bottom of the first section bears the printed name and wet signature of the design lead assigned to this product line, so you know the concession was reviewed and approved by the team that set the original print specs, rather than a non-technical team member unfamiliar with the part’s end use. You double-check that the signature is dated within the last 48 hours, per shop policy, so you know the approval is still active for this production run and was not granted for a different batch of the same part from three months prior.

A Concession Note on the First Piece
A tag and a wire, stamp turned away.

Bench cross-check for this first-piece waiver

This step ensures you do not start full production based on a misaligned document or incorrect measurement, and follows standard shop first-piece protocol for all runs with approved concessions. Complete each step in order before entering any new offsets into the machine control or pressing the cycle start button:

  1. Line up the concession note next to the printed part drawing on your bench mat, aligning the dimension callout on the drawing (printed in the upper right corner of the flange view) with the description on the note to confirm you are referencing the same feature, not a different flange on the opposite side of the bracket.
  2. Take three separate measurements of the out-of-spec feature on your first piece with your calibrated calipers, rotating the part 120 degrees between each reading to account for any slight taper across the flange face, writing each measurement in the open margin of the note to confirm all readings match the value listed on the approved document.
  3. Hold the first piece up to the 3D-printed test fixture for the mating assembly, sliding it into the slot to confirm the oversized flange fits without binding, as noted on the waiver, and that the bolt holes line up perfectly with the fixture’s guide pins with no forced adjustment needed.
  4. Mark the edge of the first piece with a green paint pen to flag it as the approved first-piece sample for the rest of the run, so you can compare all subsequent parts against it as you pull them from the machine every 10 units to check for drift.
  5. Note the adjusted -0.003 inch offset you will enter into the machine control after verifying the concession, so you can bring as many of the remaining 119 parts in the run into spec as possible without extending run time unnecessarily or risking pushing the dimension below the lower tolerance limit.

You do not adjust any other offsets at this stage, since all other measured dimensions on the first piece fall well within the print tolerance bands, including the bolt hole position, the thread depth on the mounting studs, and the flatness of the back face. You also note that the concession only applies to this specific production run of 120 units, so you cannot carry the approval over to the next batch of the same part scheduled for next month, which has a tighter revised tolerance for the flange width per updated design requirements.

Future reference use for this approval form

The next time you pull this sheet out, you will be closing out the production run and tying all supporting documentation to the job file before it moves to deburring and finishing. You will first attach this form to the back of the part print, along with your first-piece measurement log and the daily calibration slip for your calipers, to create a full paper trail for every part in the run that can be referenced if any questions arise later in the production process or after parts are delivered to the assembly team. You drop the full packet off at the Traveler Desk on your way to the break room after the final part comes off the machine, so the production coordinator can file it with the rest of the job’s records in the central digital and physical filing system. If a question arises about the flange dimension on any unit from this run six months from now, the quality team will pull this form first to confirm the concession was approved before the run started, and that the first-piece sample matched the approved value noted on the document. You add your own signature and the time of your first-piece check to the bottom of the form now, so anyone reviewing it later can confirm you verified the part against the approved concession before starting full production, rather than discovering the out-of-spec dimension mid-run and adjusting without formal approval. You also jot the three flange readings you took in the margin, so there is a clear record of the exact first-piece dimensions you used to validate the run, with no gaps or missing data that could cause confusion later. You tuck the form into the clear plastic sleeve holding the part print before entering the new offset into the machine control, so it stays easily accessible for any spot checks from the quality team while the run is in progress.