A time line is on the sheet. You have not written it. The 1.5 inch 6061 aluminum bar is clamped in the CNC vise, end faced flat within 0.002 inches per the print callout, and your calipers sit zeroed on the bench edge next to the printed sheet you pulled from Traveler Desk 3 minutes earlier. You tap the cycle hold button on the control panel to pause the preloaded program before it engages the end mill, so you can cross-reference every required value against this sheet before you make the first cut that sets the standard for the entire 50-unit lot.
Logged Setup Reference Values For This Run
Pre-printed values on this sheet include the vise psi set to 220, end mill specification for a 4-flute carbide 3/8 inch tool, spindle speed set to 3200 RPM, and feed rate set to 18 IPM for roughing and 12 IPM for finishing. You cross off any value that you adjust before running the program, write the new value in the right margin next to the pre-printed line, and initial it so anyone working the lot later knows the change was intentional and approved by you as the setup machinist. If you change the end mill for any reason mid-run, you log the new tool number and length offset here immediately, no waiting until after you cut the next piece to jot it down, to avoid mismatched offset values that cause out-of-spec parts.

Measured Stock Allowance Calculations For This Cut
You calculate the extra material left on the bar for facing and roughing before you initiate the first cut, to confirm you have enough material to hit the finished part dimensions without cutting too close to the vise jaw. The pre-cut bar length is 12.125 inches, the finished part length is 12.000 inches, so you have 0.125 inches total allowance to split between the initial face cut, two roughing passes, and final finish pass. You confirm the bar protrudes 12.2 inches from the vise jaw to avoid any tool collision with the vise face during the final side milling passes that shape the mounting flange. Illustrative example: If you adjust the roughing pass depth to remove an extra 0.01 inches per side, you reduce the final finish pass time by 12 seconds per piece, enough to cut 10 minutes off the total lot run time for 50 units, without risking tool breakage or poor surface finish. You log any adjustments to pass depth in the margin of this sheet before you run the first piece.
Required Post-Cut Tolerance Checks For This Part
As soon as the first piece finishes the cycle and cools to room temperature for 5 full minutes (aluminum expands when heated by cutting friction, so measuring a warm part gives inaccurate readings), you check 7 critical dimensions aligned to the print callouts: overall length, outer diameter of the milled center boss, depth of the 1/4-20 threaded hole, position of the two 0.25 inch mounting holes, flatness of the mounting face, perpendicularity of the boss to the mounting face, and surface roughness of the sealing groove. Each measured value gets written in the blank column next to the corresponding print callout, no rounding to the nearest tolerance limit if it’s out of spec—write the exact measured value, no matter how far off it is, so you can trace the root cause of the deviation easily. If any dimension falls outside the printed tolerance range, you do not proceed with the rest of the lot until you adjust the program or setup to fix the issue.
Adjustment Steps For Subsequent Lot Pieces
If the first piece falls outside tolerance, or you observe issues with surface finish or tool performance, you follow these steps in order before running the rest of the lot:
- Input any required offset adjustments to the CNC control panel, then write the new offset value in the margin of this sheet next to the relevant dimension check line, along with the exact time you made the adjustment.
- Run a test cut on a 1 inch scrap section of the same 6061 aluminum stock to confirm the adjustment produces a dimension within the middle 70% of the allowed tolerance range, not just barely within the upper or lower limit, to account for normal tool wear over the run.
- Measure the test cut piece using the same calipers or micrometer you used for the first piece to eliminate measurement tool variation between checks, and zero the tool before each measurement to confirm consistent readings.
- Log the test cut measurement on this sheet directly below the first piece’s matching dimension entry, and initial the entry to confirm you performed the test cut before running the rest of the lot.
- If you make more than three adjustments to the same dimension without hitting the target tolerance, pause the run and consult the lead machinist before proceeding, to avoid wasting excess stock or damaging the cutting tool.
If the first piece passes all tolerance checks, you still note any minor adjustments to feed rate or spindle speed you make for the rest of the lot in the margin of this sheet, to keep a full record of the run parameters.
Observed Deviation Notes For This First Piece
This section is for any unexpected observations you make during the first cut, not just out of spec dimensions. For example, if you hear unusual chatter from the end mill during the roughing pass, you note that here, along with any adjustments you make to spindle speed or feed rate to resolve it. If you notice the vise jaw leaves a small indent on the side of the part that falls outside the non-critical surface defect limit, you note that here, and mark whether you adjusted the vise pressure or added a thin rubber shim to the jaw to prevent it on subsequent pieces. You also note any unexpected tool wear you see on the end mill after the first cut, even if the part passes all tolerance checks, so you know to monitor the tool more closely during the run and plan for a tool change earlier than scheduled if needed. You do not leave this section blank even if the first piece is fully within tolerance—you at minimum write “no unexpected deviations observed” and sign and date the entry to confirm you reviewed this section before proceeding with the lot.
Next Scheduled Time You Reference This Exact Sheet
You pull this sheet back out as soon as you finish the 25th piece in the 50 piece lot, to perform the mid-run tolerance check required for this part number. You cross-reference the measured dimensions of the 25th piece against the first piece’s logged values, to catch any gradual tool wear that would push dimensions out of spec before you run the remaining 25 units. You also pull this sheet again if the machine throws an error code mid-run, to confirm that all setup values logged here match the current control panel settings before you reset the error and restart the program, to avoid running the program with incorrect parameters that cause damaged parts or tool breakage. When the full lot is complete, you attach this sheet to the first piece in the lot before moving it to the inspection station, so the inspection team can cross-reference your logged setup values and first piece measurements against their own inspection results, and trace any issues with the lot back to specific setup adjustments if needed. You do not file this sheet with other lot records until the inspection team signs off on the full run, as you may need to reference it again if any out-of-spec parts are found during their checks.